首页> 外国专利> Installation for the manufacture of cement by dry process with precalcination furnace.

Installation for the manufacture of cement by dry process with precalcination furnace.

机译:用于通过预煅烧炉进行干法生产水泥的设备。

摘要

An installation for the dry manufacture of cement comprises a preheater heat-exchange unit of series-connected cyclones, a precalcination kiln and another cyclone associated therewith, a clinkerization kiln and a clinker cooling chamber associated with this kiln. To distribute the hot air coming from the cooling chamber suitably between the precalcination and clinkerization kilns, a device is provided for creating a gas pressure loss in the circuit between the last cyclone of the preheater and a point where a smoke gas outlet conduit of the cyclone associated with the precalcination kiln is connected to the circuit downstream of the last cyclone.
机译:用于水泥的干法制造的设备包括:串联旋风器的预热器热交换单元,预煅烧窑和与其关联的另一旋风器,熟化窑和与该窑关联的熟料冷却室。为了在预煅烧窑和熟化窑之间适当地分配来自冷却室的热空气,提供了一种装置,用于在预热器的最后一个旋风分离器与旋风分离器的烟气出口导管之间的回路中产生气压损失与预煅烧炉关联的装置连接到最后一个旋风分离器下游的回路。

著录项

  • 公开/公告号OA06852A

    专利类型

  • 公开/公告日1983-02-28

    原文格式PDF

  • 申请/专利权人 FIVES-CAIL BABCOCK;

    申请/专利号OA19810057441

  • 发明设计人

    申请日1981-07-09

  • 分类号C04B7/43;

  • 国家 OA

  • 入库时间 2022-08-22 11:03:25

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号