首页>
外国专利>
Method of construction of roadway - involves filling parallel trenches with hardenable mixture to form solid embedded strips of road
Method of construction of roadway - involves filling parallel trenches with hardenable mixture to form solid embedded strips of road
展开▼
机译:巷道的建造方法-涉及用可硬化混合物填充平行沟槽,以形成坚固的嵌入式道路条
展开▼
页面导航
摘要
著录项
相似文献
摘要
The roadway is constructed by digging a pair of parallel trenches and filling the trench with a mixture of material and an appropriate flexible hardener to form a solid embedded mass whose surface presents a strip of road. The material used to fill the trench is pref. that which was excavated to form the trench. This is compacted into the trench, and may incorporate a drainage channel and reinforcement rods which are driven into the bottom of the trench.
展开▼