首页>
外国专利>
Waste lead-away during building construction - hopper at each floor has pipe leading into hopper below
Waste lead-away during building construction - hopper at each floor has pipe leading into hopper below
展开▼
机译:建筑施工过程中的废料带走-每层料斗的管道都通向下面的料斗
展开▼
页面导航
摘要
著录项
相似文献
摘要
An arrangement for disposal of rubbish, motar etc. during construction of multi-storey buildings has a hopper at every floor attached to a pipe of woven nylon coated with PVC which leads into the hopper below, except for the lowermost pipe which can lead directly into a lorry. The pipe exerts a breaking action on the rejected matl. and prevents excessive dust.
展开▼