首页> 外国专利> Building foundation pile construction method - uses hollow auger through which, during withdrawal mortar is supplied

Building foundation pile construction method - uses hollow auger through which, during withdrawal mortar is supplied

机译:建筑基础桩的施工方法-使用空心螺旋钻,在拔出砂浆期间通过空心螺旋钻供应

摘要

The foundation pile uses a hollow auger. When the auger is withdrawn mortar is supplied via a central hollow core. After the auger has reached the required depth, but before withdrawal, oil probe operations are carried out of soil below the auger. The auger consists of a cylinder jacket (1) around which fits a helical (2). The core of jacket (1) is a tube (3) with top mounted coupling (4) for mortar supply and bottom connection to sleeve (5). The tube is centrallised in the jacket by radial pins (8). A probe rod (10) fits in the space (9) between the jacket and the tube. A cone (13) fitted at the bottom of the probe rod is guided in a bush (14).
机译:基础桩使用空心钻。取出螺旋钻时,砂浆通过中央空心孔供应。在螺旋钻达到所需深度之后,但在撤回之前,对螺旋钻下方的土壤进行油探头操作。螺旋钻由圆柱套(1)组成,圆柱套(1)周围装有螺旋形(2)。外套(1)的核心是一根管子(3),其顶部安装有连接器(4),用于砂浆供应,底部连接至套筒(5)。管子通过径向销钉(8)固定在外套中。一根探针杆(10)装在外套和管之间的空间(9)中。安装在探棒底部的圆锥(13)在衬套(14)中导向。

著录项

  • 公开/公告号NL8304100A

    专利类型

  • 公开/公告日1985-06-17

    原文格式PDF

  • 申请/专利号NL19830004100

  • 发明设计人

    申请日1983-11-30

  • 分类号E02D5/18;

  • 国家 NL

  • 入库时间 2022-08-22 08:14:34

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号