首页>
外国专利>
Building cavity wall construction - has prefabricated concrete panels, hoisted in position and secured by adhesive joints
Building cavity wall construction - has prefabricated concrete panels, hoisted in position and secured by adhesive joints
展开▼
机译:建筑空腔墙结构-具有预制混凝土面板,悬挂在适当位置并通过粘合剂连接固定
展开▼
页面导航
摘要
著录项
相似文献
摘要
The panels used in the cavity wall of a building, are transported with a hoist. Pins and clamps are used for correct positioning of the panels, whilst adhesive is applied between the panel joints. The main frame (1) is constructed of duct profiles (2). On top of the frame is a box (3) containing a controlled hydraulic mechanism. Transverse spindles (4.5) are supported in the frame. Pins are used when lifting the panels. Expandable distance pieces (42) are coupled to levers and an arm mechanism.
展开▼