首页> 外国专利> Building cavity wall construction - has prefabricated concrete panels, hoisted in position and secured by adhesive joints

Building cavity wall construction - has prefabricated concrete panels, hoisted in position and secured by adhesive joints

机译:建筑空腔墙结构-具有预制混凝土面板,悬挂在适当位置并通过粘合剂连接固定

摘要

The panels used in the cavity wall of a building, are transported with a hoist. Pins and clamps are used for correct positioning of the panels, whilst adhesive is applied between the panel joints. The main frame (1) is constructed of duct profiles (2). On top of the frame is a box (3) containing a controlled hydraulic mechanism. Transverse spindles (4.5) are supported in the frame. Pins are used when lifting the panels. Expandable distance pieces (42) are coupled to levers and an arm mechanism.
机译:建筑物空心墙中使用的面板是用葫芦运输的。销钉和夹具用于正确定位面板,同时在面板接头之间施加粘合剂。主框架(1)由风管型材(2)构成。框架的顶部是一个装有受控液压机构的盒子(3)。横向主轴(4.5)被支撑在框架中。提起面板时使用销钉。可扩展的定距件(42)连接到杠杆和臂机构。

著录项

  • 公开/公告号NL8401016A

    专利类型

  • 公开/公告日1985-10-16

    原文格式PDF

  • 申请/专利权人 KKF BEDRIJVEN B.V. TE KATWIJK.;

    申请/专利号NL19840001016

  • 发明设计人

    申请日1984-03-30

  • 分类号E04G21/22;

  • 国家 NL

  • 入库时间 2022-08-22 08:14:32

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号