首页> 外国专利> Device for measuring excavation over-running which is installed on a shield-type tunnel excavator

Device for measuring excavation over-running which is installed on a shield-type tunnel excavator

机译:安装在盾构型隧道挖掘机上的用于测量挖掘超限的装置

摘要

Device for measuring excavation over-running by a tunnel excavator of the type having a shield 30 in which a cutter-holder 36 is made to rotate in a cutting chamber 33 defined in the front part of a shield body 31 of the excavator in such a way that the cutters of the said cutter-holder carry out the excavation of the working face of the tunnel as the said shield body advances with a view to forming a tunnel, the said device comprising a retractable probe which projects radially outside a part of the excavator and means 40 for detecting the projection length of the said probe in order to specifically measure the size of excavation over-running from a position in which the probe comes to bear against the working face of the tunnel, characterised by the fact that the probe comprises a probing rod 44 which is moved in a to-and-fro motion by a member 41 for actuating the probe and a pressure sensor 46 fixed to the end of the tip of the said probing rod, the said device furthermore comprising a detector 47 for detecting the travel of the probe by determining at least the projection length of the probing rod when the pressure sensor reaches the ground. IMAGE
机译:在这样的隧道式挖掘机中,具有护罩30的类型的隧道挖掘机用于测量超速行驶的装置,其中,使刀架36在限定于挖掘机的护罩主体31的前部的切割室33中旋转。当所述防护罩主体前进以形成隧道时,所述刀架的刀具进行所述隧道的工作面的挖掘的方式,所述装置包括可伸缩探针,所述可伸缩探针沿径向伸出所述套管的一部分之外。挖掘机和用于检测所述探针的突出长度的装置40,以便专门测量从探针抵靠在隧道工作面所在的位置开始的超车尺寸,其特征在于,探针包括探测杆44,该探测杆44通过用于致动探针的构件41来回运动,并且压力传感器46固定到所述探测杆的尖端的端部,所述装置还包括当压力传感器到达地面时,至少通过确定探测杆的突出长度来检测探测器47,以探测探测器的行程。 <图像>

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号