首页> 外国专利> The control process of the operation of an installation of load of a shaft furnace and installation for loading a furnace

The control process of the operation of an installation of load of a shaft furnace and installation for loading a furnace

机译:竖炉负载设备和炉负载设备的控制过程

摘要

A process and apparatus for charging a shaft furnace is presented which ensures the vertical and symmetrical fall of charging material from a hopper onto a distribution spout. The discharge valve of the hopper and the valve of a chamber feeding material to the hopper are regulated in such a way as to form a barrage in the base of the hopper. To control the formation of this barrage, and ensure that it will be maintained throughout a charging phase, the hopper and the chamber are weighed separately, signals being produced for the control of dosing valves. In a preferred embodiment of an apparatus for performing this process, the hopper is rotated in order to reduce segregation of the charge material particles.
机译:提出了一种用于竖炉装料的方法和设备,其确保装料的垂直和对称地从料斗落到分配喷嘴上。料斗的排放阀和向料斗供料的腔室的阀被调节成在料斗的底部形成弹幕。为了控制弹幕的形成并确保在整个装料阶段都将其维持,分别对料斗和腔室进行称重,并产生信号以控制计量阀。在用于执行该过程的设备的优选实施例中,使料斗旋转以便减少电荷材料颗粒的偏析。

著录项

  • 公开/公告号BR8602182A

    专利类型

  • 公开/公告日1987-01-13

    原文格式PDF

  • 申请/专利权人 PAUL WURTH S.A.;

    申请/专利号BR19868602182

  • 发明设计人 MARC SOLVI;GILBERT BERNARD;EMILE LONARDI;

    申请日1986-05-06

  • 分类号F27D3/10;F27D19/00;

  • 国家 BR

  • 入库时间 2022-08-22 07:21:40

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号