首页> 外国专利> procedure and device, and means for utforande of vajerbultning of mountains

procedure and device, and means for utforande of vajerbultning of mountains

机译:的方法和装置,以及山峰游荡的手段

摘要

A method for carrying out wire bolting of a rock, in which method a hole is drilled in a rock, and a wire piece shorter than the hole is pushed into the hole. In order to simplify the insertion, the wire piece is pushed into the hole by the same wire from which the wire piece has been cut. A wire bolting device developed for effecting the method comprises a cutting device mounted on the carrier of the device between a wire feeding mechanism and a resilient guide pipe attached to a head guide. A mounting space is provided beside the cutting device for the mounting of a pushing support between the ends of the cut wire.
机译:一种用于对岩石进行锚固的方法,其中,在岩石中钻出一个孔,并将比该孔短的金属丝片推入该孔中。为了简化插入,将线材通过与切割线材相同的线材推入孔中。为实现该方法而开发的钢丝锚固装置包括切割装置,该切割装置安装在装置的载体上,位于钢丝进给机构和附接到头部引导件的弹性导管之间。在切割装置旁边设有安装空间,用于在切割线的端部之间安装推动支撑。

著录项

  • 公开/公告号SE8604181L

    专利类型

  • 公开/公告日1987-05-08

    原文格式PDF

  • 申请/专利权人 TAMPELLA OY AB;

    申请/专利号SE19860004181

  • 发明设计人 LEPPENEN J;

    申请日1986-10-02

  • 分类号E21D20/00;E21D21/00;

  • 国家 SE

  • 入库时间 2022-08-22 07:18:57

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号