首页>
外国专利>
JUNCTION METHOD OF REINFORCED CONCRETE EARTHQUAKE RESISTING WALL AND IT'S PERIPHERAL FRAMEWORK
JUNCTION METHOD OF REINFORCED CONCRETE EARTHQUAKE RESISTING WALL AND IT'S PERIPHERAL FRAMEWORK
展开▼
机译:钢筋混凝土抗震墙的连接方法及其周边框架
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To simplify a field execution by inserting projections from hoops of different shapes of steel bar studs secured to an iron frame at an appropriate distance, placing concrete and forming an earthquake resisting wall and peripheral framework. CONSTITUTION:Deformed steel bar studs 7 secured to an iron frame 2 by means of arc stud welding project outside from hoops wound and loaded on the periphery of the iron frame 2, and these projections 3 are inserted between wall bars 8A which are the constituent parts of a reinforced concrete earthquake resisting wall 8 at an appropriate distance. After that, concrete 4 is placed to form the peripheral frame work 1 and the earthquake resisting wall 8. According to the constitution, a bar arrangement work can be executed without crossing the peripheral framework 1 with reinforcements of the earthquake resisting wall 8, so that the simplification of a field execution and the improvement of accuracy can be attained.
展开▼