首页> 外国专利> AXIAL REINFORCED JOINT AND REINFORCED JOINT METHOD IN CAST-IN-PLACE CONCRETE LINING METHOD

AXIAL REINFORCED JOINT AND REINFORCED JOINT METHOD IN CAST-IN-PLACE CONCRETE LINING METHOD

机译:现浇混凝土衬砌方法中的轴向加筋节点和加筋节点方法

摘要

PURPOSE:To secure the coupling efficiency of a reinforcement by inserting a joint reinforcement into an axial reinforcement inserting sheath pipe fixed to the tip of a jack compatible with force fit of concrete and forming a lap joint between an axial reinforcement of existing concrete and the joint reinforcement. CONSTITUTION:In a ring-like space constituted of an internal form (A), a tail plate and an existing lining concrete (C), a jack 1 compatible with force fit of concrete is retreated and reduced, and an axial reinforcement (E) projected from a reinforced block (D) is exposed. After that, the reinforced block (D) assembled in advance is fixed to the axial reinforcement (E) by means of a lap joint. Then, an axial joint reinforcement 10 is inserted into an axial reinforcement inserting sheath pipe 5. The internal form (A) is assembled, and after placing concrete 11, the jack 1 is extended to move a press ring plate 2 backward, and at the same time, a plate (B) is moved forward, and a required length of the lap joint is formed between the reinforcement 10 and the axial reinforcement (E).
机译:目的:通过将接头钢筋插入轴向钢筋插入护套管中以确保钢筋的耦合效率,该套管固定在与混凝土的压配合兼容的千斤顶的顶端,并在现有混凝土的轴向钢筋和接头之间形成搭接接头加强。组成:在由内部模板(A),尾板和现存的衬砌混凝土(C)构成的环形空间中,与混凝土压配合兼容的千斤顶1退避并减少,轴向钢筋(E)从加强块(D)伸出的投影被暴露。之后,通过搭接将预先组装的加强块(D)固定在轴向加强件(E)上。然后,将轴向接头加强件10插入轴向加强件插入套管5中。组装内部模板(A),并且在放置混凝土11之后,使千斤顶1延伸以使压环板2向后移动,并且同时,板(B)向前移动,并且在加强件10和轴向加强件(E)之间形成所需长度的搭接接头。

著录项

  • 公开/公告号JPH01268997A

    专利类型

  • 公开/公告日1989-10-26

    原文格式PDF

  • 申请/专利权人 FUJITA CORP;

    申请/专利号JP19880096826

  • 申请日1988-04-21

  • 分类号E21D9/06;E21D11/10;

  • 国家 JP

  • 入库时间 2022-08-22 06:45:40

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号