首页> 外国专利> CONTROL ON CONCURRENT CONSTRUCTION OF SEGMENT FOR SHIELD EXCAVATOR AND SHIELD EXCAVATOR THEREFOR

CONTROL ON CONCURRENT CONSTRUCTION OF SEGMENT FOR SHIELD EXCAVATOR AND SHIELD EXCAVATOR THEREFOR

机译:盾构挖掘机段的同时施工控制及其盾构挖掘机

摘要

PURPOSE:To raise the efficiency of shield excavation by concurrently making shield excavation and segment construction by a method in which the contraction of shield jacks and the construction of segment pieces are repeated according to set placing positions for segment pieces. CONSTITUTION:In shield jack groups set on the same circumference of the inside of a skin plate 2 in the back side of a shield excavator 1, shield jacks 5 on the symmetrical position of the same position as the placing position of the nest segment piece are contracted concurrently and segment pieces 10 are constructed during the excavating period of shield extending in contact with the segment ring 10 already constructed. According to the order of set placing positions of segment pieces, the contraction of shield jacks 5 and the construction of segment pieces are repeated in order. The shield excavation efficiency can thus be enhanced.
机译:目的:通过同时进行盾构千斤顶的收缩和分段件的构造,根据分段件的设置位置重复进行盾构的挖掘和分段施工,以提高盾构的开挖效率。组成:在盾构挖掘机1背面的蒙皮板2的内部相同圆周上设置的盾构起重器组中,位于与巢状分段件放置位置相同位置的对称位置的盾构起重器5收缩同时发生,在与已构造的扇形环10接触延伸的防护罩的开挖期间构造扇形件10。根据分段件的设置放置位置的顺序,依次重复屏蔽插座5的收缩和分段件的构造。由此可以提高盾构的挖掘效率。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号