首页>
外国专利>
METHOD OF SAFEGUARDING A DEVELOPMENT WORKING
METHOD OF SAFEGUARDING A DEVELOPMENT WORKING
展开▼
机译:保障开发工作的方法
展开▼
页面导航
摘要
著录项
摘要
the invention u043eu0442u043du043eu0441u0438u0442u0441u00a0 to the case and can be used u0434u043bu00a0 of mine. the efficiency of generation by increasing the load capacity is u0441u043du0438u0436u0435u043du0438u00a0 u0446u0435u043bu0438u043au0430 and cost of construction. in a 2 set u043fu043eu0441u0442u043eu00a0u043du043du0443u044e shoring 3 and shoring u0443u0441u0438u043bu0435u043du0438u00a0 4. as u043fu0440u043eu0434u0432u0438u0433u0430u043du0438u00a0 lava 1 form the protective deflection.u0434u043bu00a0 in u043eu0431u0440u0443u0448u0435u043du043du044bu0445 rocks (op) 5 are u043fu0435u0440u0444u043eu0440u043cu0438u0440u043eu0432u0430u043du043du044bu0435 pipes (dc) 6, which are u043fu043eu0438u043du0442u0435u0440u0432u0430u043bu044cu043du043e height op 5. in one of the pt 6 pump spray particles, and in the other pt 6 to spray water on an average by 7 bln u0441u0445u0432u0430u0442u044bu0432u0430u043du0438u00a0 u0441u0432u00a0u0437u0443u044eu0449u0435u0433u043e material. on the thin seam size 6 set the one in the other.the active species is the blue side sealing u043eu0431u0440u0443u0448u0435u043du043du044bu0445 species and source components into the u043eu0441u0442u0430u0432u0448u0438u0435u0441u00a0 in op 5 emptiness. the stabilization of the species variance is u0437u0430u0442u0432u0435u0440u0434u0435u043du0438u0435 u0441u0432u00a0u0437u0443u044eu0449u0435u0433u043e material than u043eu0431u0435u0441u043fu0435u0447u0438u0432u0430u0435u0442u0441u00a0 integrity u0446u0435u043bu0438u043au0430. 2 u0437.u043f.u0444 - lu, 3).
展开▼