首页>
外国专利>
METHOD OF REDUCING WATER PERMEABILITY OF EXPLOSION EARTHFILL DAM
METHOD OF REDUCING WATER PERMEABILITY OF EXPLOSION EARTHFILL DAM
展开▼
机译:降低爆破坝水渗透性的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
the invention u043eu0442u043du043eu0441u0438u0442u0441u00a0 to u0433u0438u0434u0440u043eu0442u0435u0445u043du0438u0447u0435u0441u043au043eu043cu0443 and u0432u043eu0434u043eu0445u043eu0437u00a0u0439u0441u0442u0432u0435u043du043du043eu043cu0443 construction. the purpose of u0438u0437u043eu0431u0440u0435u0442u0435u043du0438u00a0, lowering the costs and improving the quality of the dam. u043du0435u0441u043eu0440u0442u0438u0440u043eu0432u0430u043du043du0443u044e ground mixture is directly in the reservoir 2. the mixture is released at a point 3 at a certain u0440u0430u0441u0441u0442u043eu00a0u043du0438u0438 from u0443u0440u0435u0437u0430 water. in this u0440u0430u0441u0441u0442u043eu00a0u043du0438u0435 u043eu043fu0440u0435u0434u0435u043bu00a0u0435u0442u0441u00a0 dependence to be removed.u043au043eu043bu044cu043cu0430u0442u0430u0436 u043fu0440u043eu0432u043eu0434u00a0u0442 sequentially from top to bottom, from bottom to u0433u0440u0435u0431u043du00a0 dam. the soil of the cone 4, the pulp u043fu0435u0440u0435u0440u0430u0441u043fu0440u0435u0434u0435u043bu00a0u0435u0442u0441u00a0 on u0437u0430u043cu044bu0432u0430u0435u043cu043eu043cu0443 layer 5 and a protective layer 6. the layer 6, in turn, has the characteristics of the filter. 2).
展开▼