首页> 外国专利> ARRANGEMENT FOR TRANSLOADING ROCK IN UNDERGROUND COAL MINING

ARRANGEMENT FOR TRANSLOADING ROCK IN UNDERGROUND COAL MINING

机译:地下煤矿开采岩层的布置

摘要

the invention u043eu0442u043du043eu0441u0438u0442u0441u00a0 to the case and can be used in the design of coal deposits. the objective is to reduce the labour intensity of u043fu0435u0440u0435u0433u0440u0443u0437u043eu0447u043du044bu0445 construction and capital costs of servicing transhipment point. this u043fu0440u0438u0435u043cu043du0430u00a0 u0434u043bu00a0 u00a0u043cu0430 implemented in the form of the trench 1 offset relative to the axis of the discharge u0432u0430u0433u043eu043du0435u0442u043eu043a not less than half the width of the u043eu0441u043du043eu0432u0430u043du0438u00a0 4 trench 1.the discharge u0432u0430u0433u043eu043du0435u0442u043eu043a wall 3 trenches 1 finished with the slope of the 55 60u0441. the base 4 of the trench 1 is accomplished with the rise of 15 to 16 in the direction of u0434u0432u0438u0436u0435u043du0438u00a0 conveyor. in the upper part of the trench 1 is a thin beam 5, which is stowed u0440u0435u043bu044cu0441u043eu0432u0430u00a0 u043au043eu043bu0435u00a0. on the side opposite to the inclined wall, found it.the beam 5 is tightly u043au0440u0435u043fu00a0u0442u0441u00a0 u043fu0440u0438u0441u043fu043eu0441u043eu0431u043bu0435u043du0438u00a0 u0434u043bu00a0 u0440u0430u0441u043au0440u044bu0442u0438u00a0 bottoms (hammer) and unloading u0432u0430u0433u043eu043du0435u0442u043eu043a. in the basis of four trenches 1 installed conveyor 9. when in contact with the bottom u043eu0442u043au0440u044bu0432u0430u0435u0442u0441u00a0 jackhammer trolley, u0433u043eu0440u043du0430u00a0 mass u0440u0430u0437u0433u0440u0443u0436u0430u0435u0442u0441u00a0 and arrives at a raised wall 3 of the trench 1, and from there to the conveyor 9. it u0433u043eu0440u043du0430u00a0 mass u043fu0435u0440u0435u0434u0430u0435u0442u0441u00a0 at any subsequent vehicle. 1, z. s - lu, 3).
机译:本发明针对这种情况,可以用于煤层的设计中。目的是减少维修转运点的劳动强度,并减少施工中的劳务成本。该 u043f u0440 u0438 u0435 u043c u043d u0430 u00a0 u0434 u043b u00a0 u00a0 u043c u0430以沟槽1的形式相对于放电轴 u0432 u0430 u0433 u043e u043d u0435 u0442 u043e u043a不少于 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0 4个沟槽1.放电 u0432 u0430 的宽度的一半 u0433 u043e u043d u0435 u0442 u043e u043a墙3沟槽1的坡度为55 60 u0441。沟槽1的底部4通过在传送带上朝 u0434 u0432 u0438 u0436 u0435 u043d u0438 u00a0的方向上升15到16来完成。在沟槽1的上部有一个细梁5,它被存放在 u0440 u0435 u043b u044c u0441 u043e u0432 u0430 u00a0 u043a u043e u043b u0435 u00a0中。在与倾斜墙相对的一侧找到了它。梁5紧紧地 u043a u0440 u0435 u043f u00a0 u0442 u0441 u00a0 u043f u0440 u0438 u0441 u043f u043e u043e u0441 u043e u0431 u043b u0435 u043d u0438 u00a0 u0434 u043b u00a0 u0440 u0430 u0441 u043a u0440 u044b u0442 u0438 u00a0底部(锤子)和卸载 u0432 u0430 u0430 u0433 u043d u0435 u0442 u043e u043a。在四个沟槽1的基础上,安装了传送带9。当与底部 u043e u0442 u043a u0440 u044b u0432 u0430 u0435 u0442 u0441 u00a0手提钻车接触时, u0433 u043e u0440 u043d u0430 u00a0质量 u0440 u0430 u0437 u0433 u0440 u0443 u0436 u0430 u0435 u0442 u0441 u00a0到达沟槽1的凸起壁3,然后从那里到达传送带9。 u0433 u043e u0440 u043d u0430 u00a0质量 u043f u0435 u0440 u0435 u0434 u0430 u0435 u0442 u0442 u0441 u00a0 1,z。 s-lu,3)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号