Mine shaft lining construction - lining sections resting on concrete foundation on slide bearing

机译:矿井竖井衬砌施工-衬砌部分位于滑动轴承的混凝土基础上

摘要

The method is for sinking a mine shaft. It consists of drilling a hole with an oversize bore of the required width and height for the foundation. A water-pressure sealed sectionalised shaft lining and a support cylinder to resist lateral pressure from the rock are then installed. The oversize bore is filled with concrete up to and including the void around the bottom of the base lining section (7). The underside of the foundation (15) is on an inclined angle with the rock face, the same angle as the base (18) of the bottom lining section (7), and between that and the top of the foundation (19) is a slide bearing (20). USE/ADVANTAGE - Sinking and lining new shaft for mine. A secure foundation is obtained both in stable and unstable rock.
机译:该方法用于下沉矿井。它包括钻一个带有超大直径孔的孔,该孔具有基础所需的宽度和高度。然后安装了水压密封分段式轴衬和一个抵抗岩石侧向压力的支撑筒。超大孔内填充混凝土,直至并包括底部衬砌部分(7)底部周围的空隙。地基(15)的底侧与岩石表面成一定角度,与底衬部分(7)的底部(18)相同,并且与底面(19)的顶部之间的夹角为滑动轴承(20)。使用/优点-下沉并衬里新矿井。在稳定和不稳定的岩石中都可以获得牢固的基础。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号