首页> 外国专利> Process of fixing internally titanium-lined doubled-walled tubing structure to titanium tube sheet

Process of fixing internally titanium-lined doubled-walled tubing structure to titanium tube sheet

机译:将内部衬有钛的双壁管结构固定到钛管板上的过程

摘要

A process of fixing a double-walled tubing structure to a titanium tube sheet, the tubing structure comprising a non-titanium outer tube and a titanium inner lining tube, comprising the steps of: pressure- welding a titanium collar to an end face of the outer tube to form an integral titanium end portion at one end of the outer tube; inserting the titanium lining tube in the outer tube and fixing the titanium lining tube to the outer tube in pressed contact with the inner surface of the outer tube to form the titanium-lined double-walled tubing structure; and inserting an end section of the tubing structure in a hole in the tube sheet, and welding the titanium end portion of the outer tube and an end portion of the lining tube to the tube sheet. Instead of the titanium collar being directly welded to the outer tube, an auxiliary collar made of a metal material for sound welding to the outer tube may be pressure- welded at its one end to the titanium collar, and fusion-welded at the other end to the outer tube. In either case, the titanium end portion of the internally titanium-lined double-walled tubing structure is positioned in the hole and welded to the tube sheet.
机译:一种将双壁管结构固定到钛管板上的方法,该管结构包括非钛外管和钛内衬管,该方法包括以下步骤:将钛套环压焊到该钛管的端面上。外管在外管的一端形成一体的钛端部。将钛衬管插入外管,并将钛衬管固定在与外管内表面压接的外管上,以形成钛衬里双壁管结构。将管结构的端部插入管板的孔中,并将外管的钛端部和衬管的端部焊接至管板。代替将钛套环直接焊接到外管上,可以将由金属材料制成的用于将其可靠焊接到外管的辅助套环的一端压焊到钛套环上,并在另一端熔焊。到外管。在任一种情况下,内部衬有钛的双壁管结构的钛端部都位于孔中并焊接到管板上。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号