PURPOSE:To individually design the water supply plans of plural service reservoirs connected to a single supply section by calculating the estimated change of the supply amount of each reservoir set by the supply pressure control via a contracted pipeline network when the water supply is estimated. CONSTITUTION:The water supply pressure is measured by the water pressure measuring parts 4a and 4b when the water is supplied to an A service reservoir 2a and a B service reservoir 2b from a supply section 1. These measurement data are sent to a central control center 6 via the remote monitor controller 5a and 5b. The part 6 stores the contracted data consisting of the nodal point data on the section 1 and the pipeline data. Then a pipeline is calculated based on a contracted model and therefore the daily water supply amount can be estimated for each reservoir. If only the total supply amount changes despite the supply pressure operation plan equal to that of the preceding day or the same changing form is estimated for the demand peak pattern in terms of an entire water supply section, the supply amount of each reservoir is estimated by the general demand estimation.
机译:目的:通过估算在估计供水量时,通过缩水管网计算由供水压力控制装置设定的每个水库的供水量的估计变化,从而单独设计与单个供水段相连的多个服务水库的供水计划。组成:当水从供水部分1供应到A服务水库2a和B服务水库2b时,水压力测量部件4a和4b测量供水压力。这些测量数据被发送到中央控制中心通过远程监控器控制器5a和5b,如图6所示。部件6存储由段1上的节点数据和管线数据组成的收缩数据。然后,基于收缩模型计算管道,因此可以估算每个水库的每日供水量。如果尽管供水压力操作计划等于前一天而仅总供水量发生了变化,或者如果就整个供水段的需求峰值模式估算出相同的变化形式,则每个水库的供水量将通过一般需求估算。

著录项

  • 公开/公告号JPH0355602A

    专利类型

  • 公开/公告日1991-03-11

    原文格式PDF

  • 申请/专利权人 MEIDENSHA CORP;

    申请/专利号JP19890191137

  • 申请日1989-07-24

  • 分类号G05B17/02;

  • 国家 JP

  • 入库时间 2022-08-22 06:03:40

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号