首页> 外国专利> METHOD OF DETERMINING BEARING CAPACITY OF PILE IN FROZEN GROUND

METHOD OF DETERMINING BEARING CAPACITY OF PILE IN FROZEN GROUND

机译:冻土中桩承载力的确定方法

摘要

the invention u043eu0442u043du043eu0441u0438u0442u0441u00a0 to construction and can be used in determining the load bearing capacity of pile in u043cu0435u0440u0437u043bu044bu0445 soil. purpose u0438u0437u043eu0431u0440u0435u0442u0435u043du0438u00a0 u00a0u0432u043bu00a0u0435u0442u0441u00a0 shortening u0438u0441u043fu044bu0442u0430u043du0438u00a0.method u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 load bearing capacity of pile in u043cu0435u0440u0437u043bu044bu0445 soil includes u0441u0442u0443u043fu0435u043du0447u0430u0442u043eu0435 on u0433u0440u0443u0436u0435u043du0438u0435 pile static loading, unloading the pile in each stage is not less than three times, followed by u043du0430u0433u0440u0443u0436u0435u043du0438u0435u043c pile u043fu043eu0441u0442u043eu00a0u043du043du043eu0439 u0434u043bu00a0 the step load, and the load u0432u0440u0435u043cu00a0 extracts after each u0440u0430u0437u0433u0440u0443u0436u0435u043du0438u00a0 increase n a period of time equal to the first u043du0430u0433u0440u0443u0436u0435u043du0438u00a0.in the process of u043du0430u0433u0440u0443u0436u0435u043du0438u00a0 pile soil u043cu0435u0440u0437u043bu043eu0433u043e u0438u0437u043cu0435u0440u00a0u044eu0442 deformation at each wind - load of the total deformation u0432u044bu0434u0435u043bu00a0u044eu0442 plastic u0441u043eu0441u0442u0430u0432u043bu00a0u044eu0449u0443u044e and u0445u0430u0440u0430u043au0442 it u0438u0437u043cu0435u043du0435u043du0438u00a0 yeru u043eu043fu0440u0435u0434u0435u043bu00a0u044eu0442 very prolonged resistance u043eu0441u043du043eu0432u0430u043du0438u00a0 pile static load. 2). (to / with
机译:本发明在施工中可以用于确定桩在土壤中的承重能力。u043c u0435 u0440 u0437 u043b u044b u0445 。用途 u0438 u0437 u043e u0431 u0440 u0435 u0442 u0435 u043d u043d u043b u00a0 u0435 u0442 u0442 u0431 u00a0缩短 u0438 u0441 u0441 u0431 u0430 u043d u0438 u00a0。方法 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0 u043c u0435 u0440 u0437 u043b u044b中的桩的承载力 u0445土壤包括 u0433 u0440 u0443 u0433 u0435 u0435 u043d u043d u04438 u0443 u0435 u043d u0434 u0430 u0442 u0432 u0435 u0435 u0435 u0435 u0435每个阶段不少于三遍,其次是 u043d u0430 u0433 u0440 u0443 u0436 u0435 u043d u0438 u0435 u043c桩 u043f u043e u0441 u0442 u0442 u0432 u043e u00a0 u043d u043d u043e u0439 u0434 u043b u00a0步进加载,并且在每个 u0440 u0430 u0437 u0433 u0440 u0443 u0436 u0435 u043d 之后提取的负载 u0432 u0440 u0435 u043c u00a0 u0438 u00a0增加的时间等于第一个 u043d u0430 u0433 u0440 u0443 u0436 u0435 u043d u0438 u00a0的时间段。 u0430 u0433 u0440 u0443 u0436 u0435 u043d u0438 u00a0桩土 u043c u0435 u0440 u0437 u043b u043e u0433 u043e u0438 u0437 u043c u0435 u0440 u00437 u0437 u043c u0442每次风的变形-总变形的载荷 u0432 u044b u0434 u0435 u043b u00a0 u044e u0442塑料 u0441 u043e u0441 u0441 u0442 u0430 u0432 u043b u043b u00a0 u044e u0449 u0443 u044e和 u0445 u0430 u0440 u0430 u043a u0442它是 u0438 u0437 u043c u0435 u043d u0435 u043d u043d u0438 u00a0 yeru u043e u043e u043f u0440 u0435 u0434 u0435 u0435 u00a0 u044e u0442非常长的阻力 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0桩的静载荷。 2)。 (到 /

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号