首页> 外国专利> process for angießen of polbrücken and poland finished plattensätze mounted electrical akkumulatorenzellen

process for angießen of polbrücken and poland finished plattensätze mounted electrical akkumulatorenzellen

机译:polbrücken和波兰的安吉森完成工艺,完成了安装在平台上的电子吊瓶

摘要

The melting-on process of the straps and terminals onto the current-carrying lugs, which proceeds, according to the cast-on straps (COS) principle, in a casting mould 1 designed as a two-cavity die, is terminated, in view of possible differences of the lug thicknesses in the positive and negative plate group halves, by differential cooling. After simultaneous lifting of the cooling vessels 6, 7 against the moulds into a first position, at a cooling water level a, has first caused both terminals to solidify, cooling is continued at the cooling water level b, using a timer-controlled lead time in favour of the strap type which has the thinner lugs attached to it (in this case, for example, the negative type), so that the thicker lugs of the positive plate group half are exposed to the molten lead in accordance with their greater heat requirement. IMAGE
机译:鉴于此,将带和端子在载流接线片上的熔化过程终止,该熔化过程根据浇铸带(COS)原理在设计为两腔模具的铸模1中终止。正差板组和负差板组两半中的凸耳厚度可能存在差异,这是通过差异冷却来实现的。在将冷却容器6、7相对于模具同时提升到第一位置后,首先在冷却水位a上使两个端子都固化,然后使用计时器控制的提前期在冷却水位b上继续冷却有利于带型,该带型具有较细的接线片(在这种情况下为负型),因此正极板组一半的较粗的接线片会因其较大的热量而暴露于熔融铅中需求。 <图像>

著录项

获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号