EXECUTING METHOD FOR WORK FOR SHEET PILE INTO RUBBLE-MOUND LAYER

机译:板桩到卵石层中的施工执行方法

摘要

PURPOSE:To efficiently insert a sheet pile, by a method wherein after a slot excavated in a rubble-mound layer is filled up with sand, another slot is excavated in the rubble-mound layer adjacent to said slot, and at the same time, the sheet pile is inserted into the slot filled up with sand, ahead of the tip of an auger screw. CONSTITUTION:The first slot 5 is bored through a rubble-mound layer 4 by an excavator consisting of an auger screw 12 and the like. Then, after the auger screw 12 only is lifted up and a hollow casing 1 is filled up with sand 7, the casing 1 is lifted up. After that, at a position adjacent to the slot 5 filled up with sand 7, another slot 5 is excavated with the auger screw 12, and at the same time, a sheet pile 8 is inserted into the slot 8 filled up with the sand 5, ahead of the tip of the auger screw 12.
机译:用途:为了有效地插入板桩,通过一种方法,在该方法中,在用碎石堆砌的层中挖出的狭缝填满沙子后,在与该槽相邻的碎石堆成层中挖出另一个槽,同时,将板桩插入到装满沙子的狭槽中,然后推入螺旋螺杆的尖端。组成:第一槽5是由螺旋钻12等构成的挖掘机在瓦砾土层4上钻孔的。然后,在仅提起螺旋钻螺杆12并且用沙子7填充中空壳体1之后,提起壳体1。之后,在与充满沙子7的狭槽5相邻的位置处,用螺旋钻12开挖另一个狭槽5,同时,将板桩8插入充满沙子5的狭槽8中。 ,在螺旋钻的螺钉尖端之前12。

著录项

  • 公开/公告号JPH042132B2

    专利类型

  • 公开/公告日1992-01-16

    原文格式PDF

  • 申请/专利权人

    申请/专利号JP19850259757

  • 发明设计人

    申请日1985-11-21

  • 分类号E02D5/02;E02D5/20;E05D7/00;

  • 国家 JP

  • 入库时间 2022-08-22 05:42:12

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号