首页> 外国专利> FILLER GROUTING WORK BY H-STEEL DRAWING IN UNDERGROUND STRUCTURE CONSTRUCTION

FILLER GROUTING WORK BY H-STEEL DRAWING IN UNDERGROUND STRUCTURE CONSTRUCTION

机译:地下结构施工中采用H型钢拉拔填缝工程

摘要

PURPOSE:To reduce the cost of construction as well as raise the durability of construction work by a method in which grout is injected into an excavated pit and mixed with the soil of the pit, H-steels are penetrated and then drawn out after the cement hardens, and a filler is injected to form a pressure-sharing layer. CONSTITUTION:The ground is excavated by a mixing auger machine, grout is injected into the pit and mixed with the soil of the pit to form a sludgy treated soil layer 1. A form part 3 consisting of H-steels 4 coated with a releasing agent and with lower parts having cap 7 is penetrated into the treated soil layer 1. After the soil cement layer 12 of the layer 1 is formed by hardening, the steels 4 are drawn out, during which period a filler is injected through a connecting pipe 11 from a pressure sender 14 into the cap and hardened. The lowering of strength due to thermal conduction and corrosion of the H- steels can thus be prevented to permit it to reuse.
机译:目的:通过将水泥浆注入开挖的坑中并与坑的土壤混合的方法,以降低施工成本并提高施工工作的耐用性,将H型钢渗透并在水泥浇筑后抽出硬化,并注入填料以形成均压层。组成:地面用混合螺旋钻机开挖,将水泥浆注入坑中,并与坑中的土壤混合,形成泥浆处理过的土壤层1。形成部分3由H型钢4组成,上面涂有脱模剂带有盖7的下部穿透到处理过的土壤层1中。在通过硬化形成层1的土壤水泥层12之后,将钢4抽出,在此期间通过连接管11注入填料。从压力传感器14进入盖子并硬化。因此,可以防止由于导热和H型钢的腐蚀而导致强度降低,从而使其重新使用。

著录项

  • 公开/公告号JPH0432166B2

    专利类型

  • 公开/公告日1992-05-28

    原文格式PDF

  • 申请/专利权人

    申请/专利号JP19870192328

  • 发明设计人

    申请日1987-07-31

  • 分类号E02D5/18;E02D5/02;E02D5/20;

  • 国家 JP

  • 入库时间 2022-08-22 05:38:56

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号