首页> 外国专利> METHOD FOR COMPACTING ROAD BED UNDER CROSSTIE

METHOD FOR COMPACTING ROAD BED UNDER CROSSTIE

机译:交叉路基下路基的压实方法

摘要

PURPOSE: To fluidize and consolidate the part of a ballast leading to the undersides of sleepers by positioning a loading plate on the ballast between the sleepers, and effecting static loading on a loading plate while vibrating it. CONSTITUTION: Sleeper 1 positions are fixed immediately after the work of consolidating a ballast 2, and a loading plate 4 is positioned between the sleepers 1. Static pressure 5 is applied to the loading plate 4, together with a vibrating force 6, and the part of the ballast up to a range indicated by a broken line 3 above the unloosened part 7 of the ballast is consolidated. Thus, since fluidized granular material in the range of the ballast part from between the sleepers to the outsides of longitudinal centers on the undersides of the sleepers on both sides can be consolidated, the progress of track deviation can be reduced.
机译:目的:通过将压板放置在轨枕之间的压载物上,并在振动时使压载物产生静载荷,从而流化并加固通向枕木底侧的压载物。组成:枕木1的位置在加固道ast 2的工作之后立即固定,并且在枕木1之间放置了一个加载板4。静压5与振动力6一起作用在加载板4上,并且部件压载物的高度直到在压载物未松开部分7上方的虚线3所指示的范围内被巩固。因此,由于能够使压载物部分从轨枕之间到两侧轨枕的下侧的纵向中心的外侧的范围内的流化粒状材料固结,因此能够减少轨道偏移的进行。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号