首页> 外国专利> equipment consists of two bridges, furniture sviluppabili and an arm posacentine, mounted on a single chassis, fitted with stabilisers which carry out in tunnel constructionthe pose of the arches and their subsequent attachment

equipment consists of two bridges, furniture sviluppabili and an arm posacentine, mounted on a single chassis, fitted with stabilisers which carry out in tunnel constructionthe pose of the arches and their subsequent attachment

机译:设备由两座桥梁,家具sviluppabili和一个臂索森汀组成,它们安装在一个底盘上,并配有稳定器,这些稳定器可在隧道施工中进行拱的位姿及其后续连接

摘要

机译:

著录项

  • 公开/公告号ITMI921979D0

    专利类型

  • 公开/公告日1992-08-11

    原文格式PDF

  • 申请/专利权人 CAVATTONI OMAR;CAVATTONI OMAR;

    申请/专利号IT1992MI01979

  • 发明设计人 CAVATTONI OMAR;

    申请日1992-08-11

  • 分类号E21Dnull/null;

  • 国家 IT

  • 入库时间 2022-08-22 05:33:30

相似文献

  • 专利
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号