首页> 外国专利> PROCEDURE FOR THE Lining OF UNDERGROUND LONG DISTANCE CAVITIES WITH AN ADVANCE SHIELD PRESENTING A BLADE LID OR A CLOSED SHIELD COATING AND AN APPROPRIATELY CONFIGURED DEVICE.

PROCEDURE FOR THE Lining OF UNDERGROUND LONG DISTANCE CAVITIES WITH AN ADVANCE SHIELD PRESENTING A BLADE LID OR A CLOSED SHIELD COATING AND AN APPROPRIATELY CONFIGURED DEVICE.

机译:用高级屏蔽板预装刀片盖或封闭屏蔽板和适当配置的设备来衬砌地下长距离腔的方法。

摘要

IN A PROCEDURE AND DEVICE FOR THE DEMOLITION AND FLOORING / PREFABRICATION OF GALLERIES, TUNNELS, WELLS OR SIMILAR. LONGITUDINALLY EXTENDED WORKS PROPULSION IS MADE WITH THE HELP OF A BUILDING DEVICE OR FRONT TUNNEL KNIFE. THE REAR PART (24) OF THE SHIELD OR BLADE IS USED AS AN EXTERNAL FORMWORK FOR CONCRETE FLOORING IN SITU USED IN THE PREPARATION OF CONCRETE SECTIONS (28, 30, 32). TO PREVENT THE TERRRAPLENING BLADE INCOMPLETELY, IT IS HOLLOW SPACE BETWEEN THE CONCRETE IN SITU SIDING (26) AND THE BASE (12) ACCORDING TO THE PROPULSION, THE REAR PART OF THE TUNNEL BUILDER OR KNIFE IS DISPOSED IN STRIPS (24) SUPPORT , SEPARATE AND PARALLEL BETWEEN YES, SINCE THE CONCRETE OF THE CONCRETE SHEET (26) IN SITU IS SPACE BETWEEN THE STRIPS IN THE FORM OF RIBS. ACCORDING TO THE PROPULSION OF THE SHIELD OR THE BLADE, THE SPACE BETWEEN RIBS IS FILLED WITH CONCRETE.
机译:在画廊,隧道,水井或类似建筑物的拆除和地板/预制过程中使用。纵向扩展工作的推进是由建筑设备或前隧道刀的帮助完成的。防护板或叶片的后部(24)用作混凝土楼板的外部模板,用于在混凝土部分(28、30、32)的制备中原位使用。为了防止不完整的破坏刀片,根据推进力,它是混凝土原位(26)和基座(12)之间的空间,隧道建物或刀的后部放在条带(24)中,分开是的,并且是相同的,因为混凝土板(26)的原位是带肋形式的条带之间的空间。根据防护板或叶片的推进,肋骨之间的空间填充有混凝土。

著录项

  • 公开/公告号ES2029540T3

    专利类型

  • 公开/公告日1992-08-16

    原文格式PDF

  • 申请/专利权人 WALBROHL HEINZ-THEO DIPL.-ING.;

    申请/专利号ES19890106157T

  • 发明设计人 WALBROHL HEINZ-THEO DIPL.-ING.;

    申请日1989-04-07

  • 分类号E21D9/06;

  • 国家 ES

  • 入库时间 2022-08-22 05:32:42

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号