首页> 外国专利> METHOD OF ROOF CONTROL IN MINING FLAT COAL SEAMS

METHOD OF ROOF CONTROL IN MINING FLAT COAL SEAMS

机译:采煤开采煤层顶板控制方法。

摘要

the invention u043eu0442u043du043eu0441u0438u0442u0441u00a0 to the case and u043fu043eu0437u0432u043eu043bu00a0u0435u0442 increase the loading capacity of the u0431u0443u0442u043eu0432u043eu0439 posed by the explosion and ensure the safety of u0432u0435u0434u0435u043du0438u00a0 mountain slave from the station. easy coal train of long branches. a u043fu0440u043eu0432u043eu0434u00a0u0442 with u043fu043eu0434u0440u044bu0432u043au043eu0439 soil species (p).from the faces parallel to line of control u0437u0430u0431u043eu00a0 to approach p is u0431u0443u0440u00a0u0442 primary and additional wells (c) 2 and 3. after the passage of control u0437u0430u0431u043eu00a0 along its lines are flat u043fu0440u043eu0442u00a0u0436u0435u043du043du044bu0439 u043fu043du0435u0432u043cu043eu0431u0430u043bu043bu043eu043d (ap) 4. u0440u0430u0441u043fu0438u0440u0430u044eu0442 him between the canopy and the p. then u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 consistent explodium primary and subsidiary. after u0432u0437u0440u044bu0432u0430u043du0438u00a0 core to form a u043fu043eu0440u043eu0434u043du0443u044e pillow 5.and u0432u0437u0440u044bu0432u0430u043du0438u0435u043c further with u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 directed displacement type cushion towards the ap, the ap u0434u0435u0444u043eu0440u043cu0438u0440u0443u0435u0442u0441u00a0, u043eu0441u0442u0430u043du0430u0432u043bu0438u0432u0430u00a0 u043bu0435u0442u00a0u0449u0443u044e mass of rocks, and ha sith blast. then, under the action of internal elastic force which restores the original shape and, at the same time, u0443u043fu043bu043eu0442u043du00a0u0435u0442 u043fu043eu0440u043eu0434u043du0443u044e lane. 3). yu
机译:u043e u0442 u043d u043e u0441 u0438 u0442 u0441 u00a0和 u043f u043e u0437 u0432 u043e u043b u00a0 u0435 u0442增加了 u0431的加载能力爆炸造成的爆炸危险,并确保来自车站的山地奴隶的安全。 u0432 u0432 u0432 u043e u0432 u043e u0439易燃的长枝火车。 u043f u0440 u043e u0432 u043e u0434 u00a0 u0442和 u043f u043e u0434 u0440 u044b u0432 u043a u043e u0439e u0439土壤种类(p)。 u0437 u0430 u0431 u043e u00a0到方法p是 u0431 u0443 u0440 u00a0 u0442主井和其他井(c)2和3。在通过控制后 u0437 u0430 u0431 u0431 u043e u00a0沿其平面是 u043f u0440 u043e u0442 u00a0 u0436 u0435 u043d u043d u043d u044b u0439 u043f u043d u0435 u0432 u043c u043e u043e u0431 u0430 u043b u043b u043e u043d(ap)4. u0440 u0430 u0441 u043f u0438 u0440 u0430 u044e u0442在树冠和p之间。然后 u043f u0440 u043e u0438 u0437 u0432 u043e u0434 u00a0 u0442一致的EXP主对象和子对象。在 u0432 u0437 u0440 u044b u0432 u0430 u043d u0438 u00a0芯之后形成 u043f u043e u0440 u043e u0434 u043d u0443 u044e枕头5和 u0432 u0437 u0440 u044b u0432 u0430 u043d u0438 u0435 u043c进一步将 u043f u0440 u043e u0438 u0437 u0432 u043e u043e u0434 u00a0 u0442定向位移型缓冲垫朝向ap,ap u0434 u0435 u0444 u043e u0440 u043c u0438 u0440 u0443 u0435 u0442 u0441 u00a0, u043e u0441 u0442 u0430 u043d u0430 u0432 u043b u043b u0438 u0432 u0430 u0432 u043b u0442 u00a0 u0449 u0443 u044e岩石块爆炸了。然后,在内部弹性力的作用下,它会恢复原始形状,同时 u0443 u043f u043b u043e u043e u0442 u043d u00a0 u0435 u0442 u043f u043e u0440 u043e u0434 u043d u0443 u044e车道。 3)。宇

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号