u0438u0441u043fu043eu043bu044cu0437u043eu0432u0430u043du0438u04351 in construction, u043fu043eu043au0440u044bu0442u0438u00a0u0445 on the bleachers.the essence of the u0438u0437u043eu0431u0440u0435u0442u0435u043du0438u00a0 coating includes a reference circuit in the form of u0442u043eu043du043au043eu0441u0442u0435u043du043du043eu0433u043e box located inside the fittings in the form of perforated u0434u0432u0443u0442u0430u0432u0440u043eu0432, internal u0440u0435u043du043du0435u0435 u0440u0430u0441u0442u00a0u043du0443u0442u043eu0435 ring u0442u0440u0435u0445u0441u043bu043eu0439u043du044bu043c of two steel sheets and placed between the reinforcing rods and concrete.a membrane in the areas of its u043fu0440u0438u043cu044bu043au0430u043du0438u00a0 contour to the team site and u0440u0430u0441u0442u00a0u043du0443u0442u043eu043cu0443 ring has two u0441u043bu043eu00a0 interconnected at an angle and the ends attached u0441u043eu043eu0442u0432u0435u0442u0441u0442u0432u0435u043du043d on the bottom and the top contour of the ring support and u0440u0430u0441u0442u00a0u043du0443u0442u043eu0433u043e education u0442u0440u0435u0443u0433u043eu043bu044cu043du043eu0433u043e space filled with concrete (4).
展开▼