首页>
外国专利>
method for building up a beginning for a along a verkehrsweges really building, such as a view or laermschutzwand.
method for building up a beginning for a along a verkehrsweges really building, such as a view or laermschutzwand.
展开▼
机译:为沿建筑物的真实建筑物(例如视图或laermschutzwand)建立起点的方法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
To construct a foundation for a noise barrier, which foundation consists of a number of individual foundations, along a traffic route, e.g. a railway track, running on an embankment, steel sheeting tubes (7) are first of all progressively positioned at the locations provided for the foundations and are lowered into the embankment body (1) while excavating the surrounding soil. Track supports (16) for forming a temporary track (14) for mobile construction equipment are laid across the lowered sheeting tubes (7). By means of this construction equipment, small pillars (18) can be lowered into the ground from this track (14) in the protection of the sheeting tubes (7) and finally - during simultaneous retreat of the track (14) - concrete can be placed in the hollow spaces formed by the sheeting tubes while the same are withdrawn. The sheeting tubes (7) therefore serve as formwork for foundation bodies in which the pillar heads of the small pillars bond in place and on which posts or the like for the noise barrier to be constructed can then be mounted. IMAGE
展开▼