首页> 外国专利> METHOD FOR CONSTRUCTION OF MINE WORKINGS

METHOD FOR CONSTRUCTION OF MINE WORKINGS

机译:矿山工程的施工方法

摘要

Use: the method is intended for carrying out both horizontal and inclined workings, namely for yn rochneni porod.pochvy Puig, elongated openings. The inventive method comprises the steps of: a recess on rocks stope value, sweep soil fastening generating, on the basis of creating a waterproofing layer. The novelty of the method is to provide a waterproofing layer at the working face, which is formed by laying on the soil layer and then solidifying the solution on top of the freshly applied layer is applied a layer of fine rock from which carried out a new cycle of penetration. Furthermore, in order to prevent disintegration of rocks at the beads develop within the fixing space filled stope hardening solution to a height of 0.3-0.5 m. 1 zp, f ly-3 yl slab with
机译:用途:该方法适用于水平和倾斜工作,即用于yn rochneni porod.pochvy Puig,细长开口。本发明的方法包括以下步骤:在形成岩石防水层的基础上,在岩石采场值上形成凹部,产生清扫土壤固结。该方法的新颖性在于在工作面上提供​​防水层,该防水层是通过以下方法形成的:将其铺设在土壤层上,然后将溶液固化,在新施加的层的顶部上施加一层细石,然后从该层上进行新的处理。渗透周期。此外,为了防止在固定空间内的珠粒处的岩石崩解,将填充的采场硬化溶液溶解至0.3-0.5m的高度。 1 zp,f ly-3 yl平板

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号