首页> 外国专利> CONSTRUCTION METHOD FOR SPILLWAY TAILWATER STRUCTURE

CONSTRUCTION METHOD FOR SPILLWAY TAILWATER STRUCTURE

机译:溢洪道尾水结构的施工方法

摘要

The invention relates to the construction of hydraulic structures, namely .vodosbrosam, the end construction of which are located on a base rock or poluskalnyh x. In order to, increase the operational reliability after installation and concreting in holes 4 of the support bars 3 by spillway passed the operating costs of the water and are monitoring the formation of downstream funnel washout 6, and after the funnel stabilization and stripping the upper portion of the support rods 3 are secured formwork 7 providing a protective concrete layer 8 and concreted cavity 9, and then cemented contact boundary 10 between the concreted cavity 9 and the sole of the bottom plate 2, 1-yl.
机译:本发明涉及水力结构,即.vodosbrosam,其末端结构位于基岩或poluskalnyh x上。为了增加操作可靠性,在通过溢洪道安装和支撑在支撑杆3的孔4中之后,通过水的运行成本并监视下游漏斗冲洗液6的形成,以及在漏斗稳定并剥离上部之后支撑杆3的其中之一是固定的模板7,其提供保护性混凝土层8和混凝土腔9,然后在混凝土腔9与底板2的底部之间的水泥接触边界10 1-yl。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号