首页> 外国专利> process and plant for the treatment of the flue gas desulphurization fgd scrubber in a wäschertrübe incurred and to minimise the landfilling solid

process and plant for the treatment of the flue gas desulphurization fgd scrubber in a wäschertrübe incurred and to minimise the landfilling solid

机译:产生烟气脱硫fgd洗涤塔的方法和装置,以最大程度地减少垃圾填埋场

摘要

the treatment of the flue gas desulphurization in a rauchgaswu00e4scher generated with begleitstoffen as plaster, metal oxides, especially iron oxide, and kohlenpartikeln, soot and / or aschepartikeln loaded wu00e4schertru00fcbe succeeds in a simple way, in accordance with the invention by $a - a e at least two gipsflotation with series connected flotationszellen (1, 2).with the tru00fcbeablauf of wu00e4schers (10) as tru00fcbezulauf (4) to the first flotationszelle (1) is connected to the konzentrataustru00e4ge; $a (5, 6) of the two flotationszellen (1, 2) are in a common line (7) together, the carriage (8) of a first hydrozyklons (9) anges on; $a - the first two flotationszellen (12) in series, a third flotationszelle (3) downstream in the tru00fcbezulauf (11) of the flotationsabgang (12) of the second flotationszelle (2) and overflow (13) of the first cyclone (9) with a common line (14) listed.
机译:根据begleitstoffen作为灰泥,金属氧化物(尤其是氧化铁)和负载有kohlenpartikeln,烟灰和/或aschepartikeln生成的劳氏沼气中烟气脱硫的简单方法可以成功实现由$ a-ae发明的至少两个gipsflotation有串联连接的浮选zellen(1、2).w u00e4schers(10)的tr u00fcbeablauf(4)与第一个浮选zelle(1)连接到konzentrataustr u00e4ge;两个浮选区lenlen(1、2)中的$ a(5、6)在一起位于同一行(7)中,第一水合酶(9)的托架(8)继续前进; $ a-串联的前两个浮选区(12),第二个浮选区(2)的浮选区(12)的tr u00fcbezulauf(11)下游的第三个浮选区(3)和第一个旋风分离器的溢流区(13) (9)列出公用行(14)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号