Pipe arrangement complete penetration section structure of reinforced concrete structure
展开▼
机译:钢筋混凝土结构的管道布置全贯入截面结构
展开▼
页面导航
摘要
著录项
相似文献
摘要
(57) Abstract Constitution The Interpolation pipe arrangement 7 the tube of the pair which possesses the tubular pore 9 which it can passComplete penetration board 8a and 8b through multiple concatenated components 10, mutuallyReinforced konkuri which should construct the reinforcement structure body 14 which it concatenates,Distribution facilities to do in specified position of to structure, in specified concatenated component 10 oppositeDoing, the main iron which forms the reinforced concrete structure which it should constructTo adhere muscle 5, in each tubular pore 9 of tube complete penetration board 8a and 8b pipe arrangement 7With the Interpolation after passing the void tube of of the approximately the same diameter, the concrete hittingFacilities it does. After the concrete solidifies, the aforementioned void tube removalLeaving it does, the complete penetration which is formed to the part where the said void tube has lain betweenIn each tubular pore 9 of hole and aforementioned tube complete penetration board 8a and 8b pipe arrangement 7 InterpolationIt does. Advantages Replacing the part which pipe arrangement 7 penetrates completely to the reinforcing rod additional strength structureBecause it compensates with structure body 14, the reinforced concrete structureThe occasion where it constructs, have pipe arrangement 7 optional place penetrate completelyBecomes possible.
展开▼