Shield tunnel subterranean docking construction method and shielded tunnelling machine
Shield tunnel subterranean docking construction method and shielded tunnelling machine
展开▼
机译:盾构隧道地下对接施工方法及盾构隧道机
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To simplify the mechanism of construction as well as shorten the period of construction by a method in which a ringed trench is formed by the first shield excavator, a peripheral hood is projected, and the water-stop plate of the second shield excavator is contacted with the inner surface of the peripheral hood to form a ringed wall. CONSTITUTION:The first and second shield excavators 1 and 19 are each started from two points a given docking point is reached, and the rotation of the cutter wheel 5 of the excavator 1 is stopped. A blade 4 is then projected forwards while being turned, and a ringed trench 26 is formed by rotation of an expanded beam 11 and a peripheral hood 16 is projected. The excavator 19 is advanced, and a water stop plate 24 is projected to form sections 28 and 29. A filler is packed into the sections 28 and 29 and hardened to form a ringed wall 30. The cutter wheels 5 and 21 are joined with a connecting plate 31 in contact with the wall 30 and the excavators 1 and 19 are dissassembled.
展开▼