PREFABRICATION METHOD OF BRIDGE PIER AND BRIDGE PIER CONCRETE BLOCK

机译:桥墩和桥墩混凝土砌块的预制方法

摘要

PURPOSE: To shorten construction period of a RC bridge pier and reduce construction cost. ;CONSTITUTION: A part which constitutes a post is standardized with concrete block cement 211 and 212 and reinforcing bar cages 22 and 23 in its construction method. Each stage of bridge pier concrete blocks 21 are connected with segment bolts 213, thereby constituting each concrete block 21. The reinforcing bar cages are inserted into the segments and welded with a structural steel 11 of a foundation 1 and added up. Concrete 20 is cast thereinto and stacked one after another, thereby building up a post 2 on the foundation 1.;COPYRIGHT: (C)1994,JPO&Japio
机译:目的:缩短钢筋混凝土桥墩的工期,降低施工成本。 ;组成:构成立柱的零件在其建造方法中用混凝土砌块水泥211和212以及钢筋笼22和23标准化。桥墩混凝土砌块21的各个阶段用分段螺栓213连接,从而构成每个混凝土砌块21。将钢筋笼插入分段中,并与基础1的结构钢11焊接并加在一起。将混凝土20浇铸到其中并逐一堆叠,从而在地基1上建造桩2。版权所有:(C)1994,JPO&Japio

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号