首页> 外国专利> PROCESS OF CONSTRUCTION OF TUNNELS IN SOFT WATER-SATURATED GROUND

PROCESS OF CONSTRUCTION OF TUNNELS IN SOFT WATER-SATURATED GROUND

机译:软水饱和地基中隧道的施工过程

摘要

FIELD: construction industry. SUBSTANCE: soft water-saturated ground in removed from within the limits of inclined tunnel and replaced with concrete with formation of continuous pillar of necessary thickness along its outer outline. Pillar provides for protection against penetration of floating earth and ground water. Then section beyond formed pillar is filled with material having lesser density. Material with lesser density is used to fill section within which limits tunnel with erection of permanent lining in case of necessity is driven. EFFECT: increased efficiency and reliability of tunnel driving. 2 cl, 2 dwg
机译:领域:建筑业。实质:从倾斜隧道的边界内移出的软饱和水地面,并由混凝土代替,沿其外部轮廓形成具有必要厚度的连续支柱。支柱可提供保护,防止浮尘和地下水渗透。然后,用密度较小的材料填充超出成型柱的部分。密度较小的材料用于填充需要驱动的永久性衬砌限制隧道的区域。效果:提高了隧道掘进的效率和可靠性。 2 cl,2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号