首页>
外国专利>
Building anchor-rail production method - presses tube in transverse direction to form bolt shank before insertion in hole in rail and expanding at end
Building anchor-rail production method - presses tube in transverse direction to form bolt shank before insertion in hole in rail and expanding at end
展开▼
机译:建筑锚轨的生产方法-在插入轨道的孔中并在端部膨胀之前,将管子横向压紧以形成螺栓柄
展开▼
页面导航
摘要
著录项
相似文献
摘要
A tube (10) cut to length is pressed in the transverse direction to form the shank, and after the foot of the latter has been inserted in a hole in the rail (6) one or more stops (2') are formed on it to secure it in position. The free end (11) of the shank is expanded in relation to it, to form a fixing portion. Pressure can be exerted in the transverse direction after insertion in the rail hole. Its end protrudes beyond the hole and can be beaded over into a collar. ADVANTAGE - It is simple to manufacture, and avoids need for solid anchor bolts.
展开▼