(57) Abstract Objective To maintain the pump discharge of the airlift pump uniformly,There is no clogging and blockade of the drainage tube of the water, drainage at the time of sewage pumpingFault of generation and the overflow broth etc of the bubble which occurs frequently in the opening water surface improvesThe air-water eliminator of the airlift pump which is done is offered. Constitution The circulation Tip rising and falling freely, position of desireTo try to be able to lock, in the circulation beginning of irrigation opening, stopping/deciding of that tubeTube of thickness of 3 - 8 times that area, circulation beginning of irrigation opening compared to 2 -In order to become 5mm high, placing outside the circulation beginning of irrigation openingThe air-water eliminator of the airlift pump which becomes.
展开▼