首页> 外国专利> Last digging Shank time of shielded tunnelling machine position measuring method

Last digging Shank time of shielded tunnelling machine position measuring method

机译:盾构掘进机最后挖柄时间位置测量方法

摘要

PURPOSE:To easily detect a position in the event of matching underground by transmitting a sound wave from one of two excavators excavating in opposite directions, receiving the sound wave at a plurality of circumferential points of the other excavator, and obtaining opposite positions of two excavators from the difference in the arriving time. CONSTITUTION:A sound wave is transmitted in the ground from a transmitting point (a) of the center of the front of a preceding shield excavator A. After that, the sound wave is received by total three points of wave receiving points bc, b1, b2 of the center of the front of a following shield excavator B and symmetrical positions separated by a radius (d). Then, a relative position of both excavators A and B is obtained based on the speed of sound in the ground, distance L between both excavators A and B, the center line of both excavators A and B, distances lc, l1, l2 between each of the wave receiving points bc, b1, b2 and transmitting point (a) and the arriving time of the sound wave at each of the wave receiving points bc-b2.
机译:目的:通过在两个相反方向挖掘的挖掘机中的一个发送声波,在另一个挖掘机的多个圆周点接收声波,并获得两个挖掘机的相对位置,来轻松地在地下匹配时检测位置从到达时间的差异。组成:声波从前一个盾构挖掘机A的前部中心的发射点(a)发射到地面。此后,声波被接收点bc,b1,跟随的盾构挖掘机B的前部中心b2和对称位置分开一个半径(d)。然后,根据地面中的声速,两个挖掘机A和B之间的距离L,两个挖掘机A和B的中心线,每个之间的距离lc,l1,l2获得两个挖掘机A和B的相对位置。接收点bc,b1,b2和发射点(a)的变化以及声波在每个接收点bc-b2处的到达时间。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号