首页>
外国专利>
Concurrent with the construction construction of the building, the hot water supply pipe arrangement modulo null which
Concurrent with the construction construction of the building, the hot water supply pipe arrangement modulo null which
展开▼
机译:与建筑物的建筑施工同时,给水管道的模数取零,
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To decrease a number of times for testing a pressure of water by performing a water pressure test after completion of interior finish work with a water pressure test header connected to a hot water supply pipe and at the time of work finished of a building in a condition that a hot water header is connected. CONSTITUTION:In a stage finishing body work of a building, a sheath pipe 1 is arranged inserting to its inside a hot water supply pipe 2 after completion of interior finish work of a floor and a wall, and a water pressure test header 3 is mounted confirming by a water pressure test the leakage of water in a connection part of the hot water pipe 2 to an elbow 5 and a faucet socket 8. The test header 3 is removed here mounting a hot water supply header 11 connected to a hot water supplier 10 connecting to its detecting port a hand pump performing the second time water pressure test, and the building is completed in its work and delivered by confirming the leakage of water with a side of the hot water supplier 10 and a side of faucets 13. In this way, an expense can be reduced.
展开▼