首页> 外国专利> Snow-melting block for snow-melting road and its construction method

Snow-melting block for snow-melting road and its construction method

机译:融雪路融雪块及其施工方法

摘要

PURPOSE:To eliminate vibration by cutting the established pavement layer at both sides of a groove for laying sprinkling block bodies in accordance with both the inclined side surfaces of the block bodies, filling sand, pebbles, or the like in the cut clearance, and then paving the cut part. CONSTITUTION:A water pipe 3 is buried inside a block body (a) which has an almost flat top surface 1 and inclining surfaces 2 being wider gradually toward the lower side, and plural sprinkling nozzles 4 are erected to the water pipe 3. Then, while the block body (a) is laid in a laying groove 9 at the level same as the upper surface of an established pavement layer 11, the layer 11 at both sides of the laying groove 9 is cut off the width almost same as the width of the clearance 12, and after the sand 13, the pebbles, or the like is filled in the clearance 12, a new pavement layer 14 is formed at the upper side of the block body (a) and at the cut part of the layer 11. And, the vibration when an automobile passes is eliminated by the block body (a) made up in the section of a trapezoid and the sand 13. The vibration can be eliminated, consequently.
机译:用途:为消除振动,可根据砌块本体的两个倾斜侧面,在用于铺设砌块本体的凹槽的两侧切割已建立的路面层,在切割间隙中填充沙子,卵石等,然后铺好切好的部分。组成:水管3埋在块体(a)的内部,块体(a)的顶表面1几乎平整,倾斜面2朝着下侧逐渐变宽,并且在水管3上竖立了多个洒水喷嘴4。在将块体(a)放置在与已形成的路面层11的上表面相同水平的放置槽9中的同时,将位于放置槽9两侧的层11切去与宽度几乎相同的宽度。在间隙12中,在将砂子13,卵石等填充到间隙12中之后,在块体(a)的上侧和该层的切割部分处形成新的路面层14。 11.并且,通过梯形的截面和砂子13所构成的块体(a)来消除汽车行驶时的振动。因此,可以消除振动。

著录项

  • 公开/公告号JPH0791817B2

    专利类型

  • 公开/公告日1995-10-09

    原文格式PDF

  • 申请/专利权人 株式会社興和;

    申请/专利号JP19890080416

  • 发明设计人 池野 正志;大島 克幸;

    申请日1989-03-30

  • 分类号E01H5/00;E01C11/26;

  • 国家 JP

  • 入库时间 2022-08-22 04:27:04

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号