首页>
外国专利>
Water permeability temporary earth stationary material, water permeability framework structure and concrete wall construction construction method
Water permeability temporary earth stationary material, water permeability framework structure and concrete wall construction construction method
展开▼
机译:透水临时土工材料,透水骨架结构及混凝土墙施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To facilitate placing work of a concrete retaining wall and to reduce the loss of a back-filling material by using a water permeable sheating material consisting of a water permeable frame structural body capable of self- independence and a water permeable back-filling material burried thereinto. CONSTITUTION:A water permeable sheating material 1 consisting of a water permeable frame structural body 2 capable of self-independence and a water permeable back-filling material burried thereinto is provided. After that, temporary sheathing materials 1 are successively piled up on a floor plane 23 between a concrete retaining wall 35 during the construction and a bedrock cut-off line 31. Then, backfilling material consisting of a backfilling material 37 and back earth 36 are backfilled between the temporary sheathing material 1 and the bedrock cut-off line 31. The back earth 36 is borne on the temporary sheathing material 1 and, at the same time, the concrete retaining wall 35 during the solidification is borne. According to the constitution, the widening of skirts of the back-filling material is suppressed, and the walling of the concrete retaining wall 35 can be prevented.
展开▼