首页> 外国专利> PRESSURE TEST METHOD FOR MAIN STEAM LEAD PIPE OF TURBINE

PRESSURE TEST METHOD FOR MAIN STEAM LEAD PIPE OF TURBINE

机译:汽轮机主汽缸管道压力试验方法。

摘要

PURPOSE: To reduce the manhours for working and manufacturing an engine frame which is required for a test on site by omitting installation of a blank cap for pressure test. ;CONSTITUTION: A main steam lead pipe 1 is connected to regular positions of a main stop valve/main steam control valve 4 and a turbine casing inlet 3. A pressure test jig 5 is arranged on the turbine casing inlet 3, while a pressure test cover 6 and pressure test jigs 7, 8 are arranged on the main stop valve/main steam control valve 4. A pressure test jig 9 is arranged on the main steam lead pipe 1. Water is poured into the main steam lead pipe 1 for carrying out pressure test.;COPYRIGHT: (C)1994,JPO
机译:目的:通过省去安装用于压力测试的盲盖来减少现场测试所需的发动机框架的工作和制造工时。 ;组成:主蒸汽导管1连接到主截止阀/主蒸汽控制阀4和涡轮机壳体入口3的常规位置。压力测试夹具5布置在涡轮机壳体入口3上,同时进行压力测试在主截止阀/主蒸汽控制阀4上设置有盖6和压力测试夹具7、8。在主蒸汽导管1上设有压力测试夹具9。将水倒入主蒸汽导管1中以进行运输。耐压测试。;版权:(C)1994,日本特许厅

著录项

  • 公开/公告号JPH06323106A

    专利类型

  • 公开/公告日1994-11-22

    原文格式PDF

  • 申请/专利权人 TOSHIBA CORP;

    申请/专利号JP19930115704

  • 申请日1993-05-18

  • 分类号F01D25/00;G01M15/00;

  • 国家 JP

  • 入库时间 2022-08-22 04:23:01

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号