首页>
外国专利>
BALLAST AND SOIL DIGGING METHOD FOR RAILROAD TRACK FLOOR REMOVAL, SOIL GROOVE DIGGING, AND SLOPE FACE STEPPING FOR LAND ARRANGEMENT AND BUILDING SITE PREPARATION
BALLAST AND SOIL DIGGING METHOD FOR RAILROAD TRACK FLOOR REMOVAL, SOIL GROOVE DIGGING, AND SLOPE FACE STEPPING FOR LAND ARRANGEMENT AND BUILDING SITE PREPARATION
展开▼
机译:铁路道底拆除的压土挖土方法,挖土槽和坡面整治土地整理与建房的方法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: To increase workability by specifying the speed of a chain body when a ballast layer is scraped off by an endless chain band supported pivotally on a V-shaped guide panel body. ;CONSTITUTION: A top end 15 of a guide panel body 12 is made in contact with the side surface of a ballast layer 14, moved in digging direction by a hydraulic cylinder body 9, and ballast is scraped off by an endless chain band supported pivotally inside it. Next the ballast scraped off is discharged from a scraped-off ballast discharge part 17, and transported by belt conveyors 3, 4, and 5. Then the movement speed of the chain band is set to approx. 2m/sec. or over, desirably at approx. 3 to 5m/sec. The chain band is connected to an elliptic chain ring body, and a wide plate body with projected body for soil scraping off is fixed to it. Also, using liftable front wheels 29 and rear wheels 31 on rails 6, and using a caterpillar traveling machine 30 on a general road, traveling is performed. Between these two travel modes, a hydraulic rotating shaft 32 is rotated for transfer. Thus work can be made even in narrow area and work efficiency can be increased.;COPYRIGHT: (C)1995,JPO
展开▼