首页> 外国专利> PREVENTIVE WORK OF SUBMARINE SCOURING AND FOOT PROTECTION STRUCTURE THEREOF

PREVENTIVE WORK OF SUBMARINE SCOURING AND FOOT PROTECTION STRUCTURE THEREOF

机译:水下冲刷和脚保护结构的预防工作

摘要

PURPOSE: To prevent submarine scouring at the front face of an outlet due to the stream of tailrace and waves. ;CONSTITUTION: A rubble bed 13 is laid down under the covering bed 14 laid on the marine ground 12 at the front face of an outlet 10 and the marine ground 12 at the front end of the covering bed 14 is replaced with rubbles 16. And a specified volume of earth in the objective range for the countermeasure of scouring in the marine ground 12 at the front face of an outlet 10 is dredged and the area is replaced with rubbles 16. The replaced rubbles are spread over the slope of the up-stream of the scoured hole brought at the submarine ground at the front face of the front end of the covering bed 14 by the action of the stream of tailrace and waves and form an armor coat there.;COPYRIGHT: (C)1994,JPO
机译:目的:防止由于尾水和海浪的冲击而在潜水艇前部进行潜水检查。 ;构成:在出口10前面海洋地面12上的覆盖层14下方放下一块碎石床13,并用碎石16代替覆盖层14前端的海洋地面12。在出口10的正面对海洋地面12进行冲刷的对策中,挖出了目标范围内的指定土方量,并用碎石16替换了该区域。替换的碎石散布在高处的斜坡上。在尾流和波浪的作用下,冲刷孔流在覆盖床14前端的海底地面处潜入海底,并在此处形成装甲。;版权:(C)1994,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号