首页> 外国专利> METHOD FOR FORMING A PENETRATION IN A WALL FOR RESCUE AND EMERGENCY-RECOVERY WORK IN A BLOCKED ROOM UNDER EXTREME CONDITIONS

METHOD FOR FORMING A PENETRATION IN A WALL FOR RESCUE AND EMERGENCY-RECOVERY WORK IN A BLOCKED ROOM UNDER EXTREME CONDITIONS

机译:极端条件下在砌块房中为抢险和应急恢复工作在墙体中形成穿透的方法

摘要

FIELD: civil engineering. SUBSTANCE: diamond drilling is used after detection a blocked room. Penetration contour preferentially of rectangular section of 60 by 30 cm size is marked, for example, by chock with big sides oriented in vertical direction, and small size oriented in horizontal direction. Then a machine is used for diamond drilling along the contour using 100 125 mm O.D. bits. Each hole is 10 30 mm underdrilled to wall internal surface, 30 50 mm junctions depending on wall thickness and material strength are between edges of adjoining holes. Then, cores are driven out of the holes using installation hammer, and junctions are broken by pinch bars, in so doing upper raw of the junctions is last to break. Further on, set free block is removed by overturning it out of the penetration onto the work area, preferentially using metal hooks. A trolley may by used when applying the method. The trolley has a firm frame provided with wheels and arresting screws. The machine positioned so to drill horizontal holes is oriented on the trolley so that lengthwise axis of the bit is parallel to wheel axles and rigidly fixed to it preferentially by bolts. Trolley and the machine are installed on the work area, in so doing the trolley enables to move along the wall easily and fast providing reduction in time consumption to change bit position when drilling horizontal raws of the holes. Two slideways for trolley wheels, preferentially made of angle sections, are installed on the base work area when it is irregular (soil, scrap of construction structures). The slideways are secured to the base using pin/anchors, preferentially passing through holes in the slideways on their ends and deepened (driven in) with their sharp ends into the base. Said method may be used to made penetrations for supply lines in the process of retrofitting buildings. EFFECT: high productivity. 3 cl, 1 tbl, 11 dwg
机译:领域:土木工程。实质:在检测到障碍物后使用钻石钻孔。刺入轮廓优选地为60cm×30cm的矩形截面,例如通过楔块标记,该楔块的大侧面在垂直方向上取向,而小尺寸在水平方向上取向。然后使用一台机器在外径为100 125 mm的情况下沿着轮廓进行金刚石钻孔。位。每个孔在墙的内表面上钻有10 30 mm底孔,取决于壁厚和材料强度,在相邻孔的边缘之间有30 50 mm的连接点。然后,使用安装锤将型芯从孔中推出,并用压杆将连接处打断,这样最后会破坏连接处的上部毛边。进一步地,通过使用金属钩将防松块从孔中倒出到工作区域上,将其清除。应用该方法时,可以使用手推车。手推车具有带轮子和固定螺丝的坚固框架。定位成钻水平孔的机器定位在手推车上,以使钻头的纵向轴线平行于轮轴,并优先通过螺栓牢固地固定在其上。手推车和机器安装在工作区域上,因此手推车能够轻松,快速地沿墙移动,从而减少了在钻水平孔时改变钻头位置所需的时间。当基础工作区不规则(土壤,建筑结构废料)时,两个小车的滑道(最好由角钢制成)安装在基础工作区上。滑道使用销钉/锚固件固定在基座上,优先穿过滑道两端的孔,并使其尖锐的末端加深(打入)到基座中。所述方法可用于在建筑物的改造过程中使供应管线穿透。效果:高生产率。 3厘升,1汤匙,11载重吨

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号