首页>
外国专利>
A method for driving in of piles and ram boring machine head for clamping a ram device on a pile.
A method for driving in of piles and ram boring machine head for clamping a ram device on a pile.
展开▼
机译:一种打入桩的方法和将夯锤装置夹紧在桩上的夯锤钻头。
展开▼
页面导航
摘要
著录项
相似文献
摘要
In a method for driving of a pile (2), where the pile has a top side and side faces extending substantially perpendicularly to the top side, a hammer assembly is held firmly in position in relation to the longitudinal axis of the pile and drives the pile into the ground by hammering on the top of the pile. According to the invention the hammering action is exerted within a defined area of the pile top, not extending to the edges of the pile, while the edge zones are held free of the hammering action. This may be carried out by means of a ram head (110) for fixation of the hammer assembly in relation to the pile, said ram head having a bottom part provided for transmitting the impact impulse to an intermediate plate or impact piece (100) which, in turn, transmits the impulse to the pile top, said bottom part of the ram head being provided with a projecting collar (126) embracing the impact piece to hold it within a defined area not extending to the edges of the pile top.
展开▼