An upper end fitting for a nuclear fuel assembly that eliminates the problem of free standing fuel assemblies leaning out of range of the lead in provided when installing the reactor upper internals structure. The outer dimensions of each upper end fitting in the fuel assembly are larger than their respective spacer grids and lower end fittings such that the nominal gap between upper end fittings is approximately 0.025 inch.
展开▼