首页> 外国专利> ROAD STRUCTURE ON MOUNTAINSIDE AND CONSTRUCTION METHOD

ROAD STRUCTURE ON MOUNTAINSIDE AND CONSTRUCTION METHOD

机译:山岭道路结构及施工方法

摘要

PURPOSE: To suppress the quantity of a cut and the area of the cut minimally by lengthening a pile on the mountain side by ensuring the advantage of the method of inhibition pile construction of the inhibition of the quantity of the cut and the area of the cut and increasing the earth-pressure resistance of the pile on the mountain side by safely building a road efficiently and constructing a vertical wall on the mountain side of the road at the time of one-side slope. ;CONSTITUTION: A series of deep foundation piles 5 are mounted on the valley side besides a series of deep foundation piles 4 on the mountain side of a road 3. The pile heads of the deep foundation piles 5 on the valley side and the intermediate sections of the deep foundation piles 4 on the mountain side are bonded by connecting beams 9 and upper floor slabs 10, and a shed 14 covering the upper section of the road 3 is constructed. Structure such as a chair is formed as a whole.;COPYRIGHT: (C)1996,JPO
机译:目的:通过确保在抑制山峰一侧堆积桩的方法的优势,通过在山侧加长桩来最小限度地减少挖方的数量和挖方的面积通过有效地安全地修筑道路并在一侧斜坡时在道路的山侧上建造垂直墙来增加山侧桩的耐土压。 ;构成:除了在道路3的山侧的一系列深基桩4外,一系列深基桩5还安装在山谷侧。深基桩5的桩头在山谷侧和中间路段。通过连接梁9和上部楼板10将山侧的深基桩4中的一小部分粘结,并建造覆盖道路3的上部的棚子14。椅子等结构整体形成。版权所有:(C)1996,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号