首页> 外国专利> Generation of electricity plant performance management device

Generation of electricity plant performance management device

机译:发电厂绩效管理装置

摘要

PURPOSE:To take a many faceted analysis by gathering plant data when a power generation plant settles and is in a thermally balanced state, inspecting the performance of the plant by using the latest collected data and past data, and outputting the inspection result together with past transition. CONSTITUTION:A plant input means 20 converts respective data on the power generation plant 1 which are inputted through sensors into process data which can be processed in a computer and those data are inputted to a plant settle ment decision means 21 and a plant data gathering means 22. Then the means 21 decides that the plant 1 is in the thermally balanced state and when the decision result of the means 21 indicates the thermally balanced state, the means 22 gathers the process data and stores them in a mass storage device as a data storage means 30. Then a retrieval means 32 retrieves the data 31 stored in the means 30 and the retrieved data are totalized by a calculating means 51 to calculate the plant performance. The transition based upon the current calculation result and past calculation result is outputted from an output means 52.
机译:目的:进行多方面分析,方法是在发电厂稳定并处于热平衡状态时收集电厂数据,使用最新收集的数据和过去的数据检查电厂的性能,并将检查结果与过去一起输出过渡。构成:工厂输入装置20将通过传感器输入的发电厂1上的各个数据转换为可以在计算机中处理的过程数据,并将这些数据输入到工厂沉降确定装置21和工厂数据收集装置中22.然后,装置21判定设备1处于热平衡状态,并且当装置21的判定结果指示热平衡状态时,装置22收集过程数据并将其存储在大容量存储装置中作为数据。存储装置30。然后,检索装置32检索存储在装置30中的数据31,并且由计算装置51对所检索的数据进行总计以计算设备性能。从输出装置52输出基于当前计算结果和过去计算结果的转变。

著录项

  • 公开/公告号JPH0816618B2

    专利类型

  • 公开/公告日1996-02-21

    原文格式PDF

  • 申请/专利权人 株式会社東芝;

    申请/专利号JP19900061060

  • 发明设计人 佐野 正明;渡辺 経夫;

    申请日1990-03-14

  • 分类号G01D21/00;G05B23/02;

  • 国家 JP

  • 入库时间 2022-08-22 04:01:33

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号