The carrying element (3) having a shape of a planar cylindrical part is set in to the excavated pit of the soil (2) in a longitudinal direction and this element is surrounded with concrete in the excavated pit of the soil (2) up to the upper edge of the toe (4) closed to the pile (7). On the upper edge of the toe (4) closed to the pile (7) is set the vertical decking (6) related to the axial direction of excavated pit touching the planar shape of the carrying element (3) from outside. The excavation pit of the soil (2) is being filled step by step and over the upper edge of the toe closed to the pile (7) up to the outer side of the vertical decking (6) with the use of loose material (8), while the residue of the excavated pit of the soil (2) together with the carrying element (3) is being filled with a concrete mixture up to the internal side of the vertical decking (6), until the excavated pit of the soil (2) is not full. After the concrete mixture closed to the pile (7) became hard the loose material (8) and the horizontal decking (6) is removed of the pile (7).
机译:将具有平面圆柱形部分的形状的承载元件(3)在纵向方向上设置在土壤(2)的挖掘坑中,并且在土壤(2)的挖掘坑中将该混凝土用混凝土包围直到脚趾(4)的上边缘向桩(7)闭合。在相对于桩(7)封闭的脚趾(4)的上边缘,设置了与从外部接触挖掘元件(3)的平面形状的挖坑的轴向有关的垂直平台(6)。使用松散的物料(8)逐步填充土壤(2)的开挖坑,并在脚趾的上边缘(对桩(7)封闭)上方直至垂直甲板(6)的外侧进行填充。 ),同时将混凝土(2)开挖坑的残留物与承载元件(3)一起填充至垂直铺板(6)内侧的混凝土混合物,直到土壤的开挖坑(2)未满。在封闭到桩(7)的混凝土混合物变硬后,松散的物料(8)和水平面板(6)从桩(7)中移出。

著录项

  • 公开/公告号SK106294A3

    专利类型

  • 公开/公告日1996-03-06

    原文格式PDF

  • 申请/专利权人 VICENA JOZEF;HALVON STEFAN;

    申请/专利号SK19940001062

  • 发明设计人 HALVON STEFAN;VICENA JOZEF;

    申请日1994-09-05

  • 分类号E02D5/30;

  • 国家 SK

  • 入库时间 2022-08-22 03:52:48

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号