首页>
外国专利>
Modular methodology for the preliminary revetment of tunnels under construction, and suitable apparatus for its implementation
Modular methodology for the preliminary revetment of tunnels under construction, and suitable apparatus for its implementation
展开▼
机译:用于在建隧道的初步护岸的模块化方法,以及用于实施的合适设备
展开▼
页面导航
摘要
著录项
相似文献
摘要
Modular methodology for the preliminary revetment of tunnels under construction, characterised in that it can be used with loose and/or rocky ground, even ground subject to landslides, and it calls for the construction of at least one precontainment module 1 in the shape of a shell, with essentially truncated conical three- dimensional configuration, basically comprising the following operations: - subhorizontal perforations with rectangular cross section of the individual element 2 of said precontainment module 1, made in the presence of revetment of the cavity until reaching the predetermined depth; - construction of the successive elements 2 so as to guarantee structural continuity with a continuous arch for the preliminary revetment; - excavation of the earth; and - repetition of the preceding operations for the subsequent modules 2 in the shape of a shell with essentially truncated conical three-dimensional configurations, until achieving the predetermined length for the tunnel. The invention also extends to a subhorizontal drilling apparatus (shown in the drawing), suitable to implement the aforesaid modular methodology. IMAGE
展开▼